Suíça
Suíça

myGeobrugg

Proteção contra correntes de detritos - Glen Eyrie 2013

View of UX/VX debris barrier looking upstream from below

Proteção contra correntes de detritos - Glen Eyrie 2013

Access road built to the right side of the UX/VX debris barrier for easy clean out

Proteção contra correntes de detritos - Glen Eyrie 2013

View from behind UX /VX debris barrier looking downstream

Proteção contra correntes de detritos - Glen Eyrie 2013

Notable-Scour-of-channel-bed-shotcrete

Proteção contra correntes de detritos - Glen Eyrie 2013

Lower barrier, where VX and UX meet. The VX barrier is almost full. Also shows UX nets over top of VX nets

 
 

Comprimento do sistema

12 m - 25 m

 

Ano de instalação

2013

Situação inicial

The Waldo Canyon Fire burned approximately 18,200 acres in the summer of 2012. A significant portion of the upper watershed of Queen's Canyon was located within the burn scar of the Waldo Canyon Fire. The Glen Eyrie Castle and Conference Center are located at the mouth of The Queen's Canyon, exposing the Conference Center to post-wildfire debris flows.

Descrição

A total of 3 Geobrugg debris flow barriers, 2 UX barriers (UX120-H6 and UX180-H6) and one VX barrier ( VX080-H4) were installed at the project site. The VX barrier was installed directly below the UX180-H6. A reinforced earth berm was also constructed at this site to create a narrower channel as well as an access road that would later be used for barrier clean out.

The UX120-H6 barrier is planned to be left in place and once filled, be used as a check dam, while the VX080-H4 and UX180 H-6 have since been cleaned out a handful of times using the constructed access road.

País / Região

Estados Unidos

Promotor

The Navigators

Empreteiro

Kane GeoTech

Contratante

Midwest Rockfall, Inc.

Objecto protegido

Edifício, Infra-estrutura turística, Infra-estrutura, Outros

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Riscos naturais
Engenharia Hidráulica
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça , Msc. Env. Eng.

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail