Suíça
Suíça

myGeobrugg

Kaikoura State Highway 1 (SR11/26)

Proteção contra correntes de detritos - Kaikoura State Highway 1 (SR11 26) 2017

View of the partially filled SL-150 barrier

Proteção contra correntes de detritos - Kaikoura State Highway 1 (SR11 26) 2017

(SR11) Looking North - SL-150 protecting the road

Proteção contra correntes de detritos - Kaikoura State Highway 1 (SR11 26) 2017

(SR26) Looking West with shallow landslide barrier SL-150

Proteção contra correntes de detritos - Kaikoura State Highway 1 (SR11 26) 2017

Protecting the road and the rail corridor

Proteção contra correntes de detritos - Kaikoura State Highway 1 (SR11 26) 2017

Debris built-up held back by the barrier

Proteção contra correntes de detritos - Kaikoura State Highway 1 (SR11 26) 2017

(SK11-14 Kiwirail) Looking West SH1: the shallow landslide barrier SL-150 protects the rail corridor; mesh partially filled with debris

 

Sistemas

 

Ano de instalação

2017

Situação inicial

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750,000 m³ of material from source zones up to 500 m above sea level.  The highly fractured greywacke meant frequent future shallow landslides had to be expected. Barriers in several locations were necessary before the reopening of the SH1 road and railway below.

Descrição

The 3.5 m high SL-150 barrier was selected due to its 150kN/m² load capacity with low defection and due to it being the only certified and tested barrier. To date three 50 to 70 m SL-150 barriers have been installed with a 5 to 8 m post spacing. Several more SL-150 barriers are planned along the corridor.

Read more about the other Kaikoura projects:

País / Região

New Zealand

Promotor

NCTIR / NZTA

Contratante

Geovert, RockControl, SRG

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG ULTRACOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail