Kaya düşmesine karşı koruma - Valley of Tempe 2010

Overview of the construction site showing the importance for the protection measures

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Fatal accident in the Valley of Tempe, main trigger for the further installed measures

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Another rockfall accident in the Valley of Tempe

Kaya düşmesine karşı koruma - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road

Kaya düşmesine karşı koruma - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road. Rockface is actively stabilized

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) and below road destroyed by rockfall

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) - below visible road reconstruction works

Kaya düşmesine karşı koruma - Valley of Tempe 2010

RX-300 rockfall barrier (for 3000 kJ) installation works

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Road view just after all works implementation

 

Sistem uzunluğu

50 m - 300 m

 

Kurulum Yılı

2010

Durum

Témpi (also Tembi / Tembe / Τέμπη) Valley is the last remaining bottleneck along the Athens - Thessaloniki Motorway.  20,000 cars  pass by the eight kilometer long gorge each day. After two consecutive fatal rockfall events, the Agean Motorway SA closed the road in agreement with the ministry of street.

Açıklama

Olympia Joint Venture signed a contract with Geobrugg to execute emergency rockfall mitigation measures with the aim to re-open the road for two weeks during Easter time. The remaing part of the work was to be completed by the end of May 2010.  In order to meet the deadline, 30 workers, six boomlifts, two truck cranes, six compressors and a helicopter were necessary.

Dangerous rock slopes were actively stabilized using TECCO® SYSTEM³ and SPIDER®.  A series of rockfall barriers were installed along the road.

Müşteri

Olympia Joint Venture (Aktor – Hochtief)

Yüklenici

Olympia Joint Venture (Aktor - Hochtief)

Gösterilen obje

Road

Korozyon koruması

Galvanized, GEOBRUGG SUPERCOATING

Mühendislik

Omikron Kappa Consulting S.A.

Alt yüklenici

Crestageo AG, Geobrugg Italia Srl, Geobrugg Ibérica & Morocco S.A.U.

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta