Fierza Hydroelectric Power Station #3

Şev ve Yamaç koruma - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Şev ve Yamaç koruma - Fierza Hydroelectric Power Station #3 2014

Drilling work and nail installation.

Şev ve Yamaç koruma - Fierza Hydroelectric Power Station #3 2014

Drilling work and nails installation completed with a "Spider" machine.

Şev ve Yamaç koruma - Fierza Hydroelectric Power Station #3 2014

Installation using a drilling machine always requires a two-man crew.

Şev ve Yamaç koruma - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Şev ve Yamaç koruma - Fierza Hydroelectric Power Station #3 2014

TECCO® G65/3 high-tensile steel mesh is very light weight, allowing helicopter installation.

 

Kurulum Yılı

2014

Durum

Slope instability on the lake sides had to be stabilized.

Açıklama

Slope stabilization with TECCO® System with TECCO® G65/3 mesh with TECMAT® for erosion control.

Stabilization of single boulder with SPIDER® S4-230 net.

Müşteri

KESH Albania

Yüklenici

Cresta Geo Switzerland

Gösterilen obje

Road, Building

Korozyon koruması

GEOBRUGG SUPERCOATING

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta