El Jocotillo electrical substation

Şev ve Yamaç koruma - El Jocotillo electrical substation 2015

View of the slopes around the power station stabilized with TECCO® SYSTEM3.

Şev ve Yamaç koruma - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 perfectly stabilized very steep slopes.

Şev ve Yamaç koruma - El Jocotillo electrical substation 2015

Another perspective of the electrical substation.

Şev ve Yamaç koruma - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 installation: TECCO® G65/3 secured using system spike plates P33/40.

 

Sistemler

 

Kurulum Yılı

2015

Durum

A slope of highly fractured and weathered volcanic rock with continually falling rocks endangered the security of an electrical substation at the bottom of the rock cutting.

Açıklama

Slope stabilization with TECCO® system and anchor bolts D25 [mm] and length 4 [m].

Müşteri

Eolic San Antonio

Yüklenici

Grupo PHI S.A.

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Grupo PHI S.A.

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta