비탈면 보강 시스템 - Morlupo 2020

Looking down the stabilized slope

비탈면 보강 시스템 - Morlupo 2020

The area after the cleaning and mowing of the vegetation

비탈면 보강 시스템 - Morlupo 2020

Placing TECCO® G65/3 mesh on the slope

비탈면 보강 시스템 - Morlupo 2020

Slope completely covered with mesh

비탈면 보강 시스템 - Morlupo 2020

Once the mesh has been set up, drilling and installation of the anchoring bars is carried out

비탈면 보강 시스템 - Morlupo 2020

Installation of the spike plates

비탈면 보강 시스템 - Morlupo 2020

Stabilized slope

 
 

Year of installation

2020

Situation

In the Morlupo municipality (Rome), a tufa rockface has always been affected by rockfalls of different sizes. Recently, freeze-thaw cycles and erosive dynamics due to surface water had intensified the fracturing and made it more frequent. As a residential area right at the top of the wall was affected, the Morlupo Municipality decided to stabilize the slope.

Description

Stabilization with TECCO® G65/3 System The net was anchored with 32 mm GEWI-type bars; 9 meters at the top, 6 meters at the bottom of the slope, with a 2 m x 2 m grid. The project was configured with the Ruvolum® dimensioning tool.

TECCO® System complies with EOTA EAD 230025000106, which was an essential fact to the municipality's choice.

Customer

Comune di Morlupo (ROMA)

Contractor

R.O.G.U. Costruzioni srl

Protected object

Residential area

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Ing. Ruggeri - Dott. Geologo Di Francesco

Subcontractor

Moretti Quintilio srl

Other installed applications

낙석방호시스템

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail