스위스
스위스

myGeobrugg

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

Drone view of the SL-150 shallow landslide barrier

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

View of the SL-150 barrier from the road

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

The barrier from upslope

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

The SL-150 from down slope

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

After the first raining day of Hurricane Eta in November 2020

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

On November 5th, 2020, the barrier is almost filled

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos 2019

The road was clear and without traffic interruptions during and after the hurricane

 

Systems

 

System length

64 m

 

Year of installation

2019

Situation

Shallow landslide events are a risk at km 36+350 Sector 3, Los Ranchos - El Florido. A gabion wall was not enough to protect the road.

Description

The first dynamic barrier in Honduras was installed on this road: an SL-150 barrier.

Customer

BCIE

Contractor

Queiroz Galvao

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

ACI

Subcontractor

ICA Inversiones

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail