미국
미국

myGeobrugg

낙석방호시스템 - Lockstein 2017

The installed RXE-500-LA barrier

낙석방호시스템 - Lockstein 2017

Example of boulder size in a possible rockfall

낙석방호시스템 - Lockstein 2017

The low weight is a huge advantage when constructing barriers, particularly if, as in this case, the use of heavy machinery is not possible

낙석방호시스템 - Lockstein 2017

Final work on the RXE-500-LA rockfall barrier. Drilling work was performed by a walking excavator with a drilling rig

낙석방호시스템 - Lockstein 2017

Overview of the fully installed RXE-500-LA rockfall barrier couple of months after installation. Visible protected touristic route

낙석방호시스템 - Lockstein 2017

RXE-500-LA with a unique rope guide - the upper support rope serves as a vertical rope

낙석방호시스템 - Lockstein 2017

Due to the growth of the natural vegetation, the barrier is hardly noticeable any more in this tourist area. One of the protected buildings in the valley is the kindergarten, which was previously threatened by rockfall

낙석방호시스템 - Lockstein 2017

The barrier is not only lightweight, but also has the highest protective function in its energy class

낙석방호시스템 - Lockstein 2017

The barrier already proves its worth shortly after installation. Rockfall of different magnitudes occurs regularly

낙석방호시스템 - Lockstein 2017

The Emmaus circular trail as a tourist attraction is now completely protected from rockfall

 

시스템 길이

29 m - 66 m

 

설치 년도

2017

Situation

A much-trodden hiking trail in Berchtesgaden with a historic Brine pipeline and a kindergarten underneath were acutely affected by rockfall. The Berchtesgaden market thus put out a tender for the construction of a rockfall barrier in the south-east slope area along the hiking trail to the Lockstein viewpoint café.

Heavy construction traffic cannot operate in this area; there were also no storage or work areas available. In the sector of the fence segments under the forest soil overlay, silty to very silty hillside debris, heavily interspersed with rocks and block parts and in part open-pore rock/block layers had to be contended with.

It was assumed from the local situation, that the thickness of the loose rock cover - hillside debris under the forest soil overlay - was several metres (> 5 m) , so that it could be basically assumed that for the anchor dimensioning, the binding line lies in loose rock throughout.

Soil classification DIN 18 301 (2012) loose soil covering BN 1, BN 2, BS 1 - BS

4; boulders/ outcropping rock FV 2, FV 5, FV 6, FD 2

(According to planning documents of Engineer Bernd Gebauer GmbH,

Traunstein)

Description

Due to the conditions described above, the barriers were installed by hand without machinery.

Anchoring: wire rope anchors 5 m long (lateral) and 4 m long (support anchors) were used. In the looseened rock area, for the lateral anchor rope on the west side flex heads were used instead of wire rope anchors.

Country/Region

독일

Customer

Markt Berchtesgaden Community

Engineering

Dipl.-Ing. Bernd Gebauer Ingenieur GmbH

Contractor

HTB Baugesellschaft m.b.H.

Protected object

Touristic infrastructure, Infrastructure, Other

부식방지

Galvanized, GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국

이메일

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
충격 보호
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국 Regional Manager California

이메일

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

자연 재해
충격 보호
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

이메일

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

자연 재해
충격 보호
Geobrugg North America, LLC,KS 67226 Wichita / 미국 Regional Manager Rocky Mountains / Central USA

이메일

Robert Long
 

Robert Long

Regional Sales Manager Southeast

자연 재해
충격 보호
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 미국 Regional Sales Manager Southeast

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

이메일

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

자연 재해
충격 보호
Geobrugg North America, LLC,OR 97302 Salem / 미국 Regional Sales Manager Pacific Northwest and Hawaii

이메일