미국
미국

myGeobrugg

Fierza Hydroelectric Power Station #2

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

Systems

 

System length

40 m - 75 m

 

Year of installation

2014

Situation

Shallow landslides were slipping into the lake and surrounding road.

Description

Landslide protection with shallow landslide barriers SL-150.

Customer

KESH Albania

Contractor

Cresta Geo Switzerland

Protected object

Road, Building

Corrosion protection

Galvanized

Engineering

-

Subcontractor

-

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail