미국
미국

myGeobrugg

Trachtbach, Canton of Bern

토석류 및 산사태 방호 시스템 - Trachtbach, Canton of Bern 2009

UX160-H4 equipped with abrasion control elements

토석류 및 산사태 방호 시스템 - Trachtbach, Canton of Bern 2009

UX-160-H4 combined with a bed reinforced with rock blocks.

토석류 및 산사태 방호 시스템 - Trachtbach, Canton of Bern 2009

VX140-H4 was designed to perfectly fit within the stream.

토석류 및 산사태 방호 시스템 - Trachtbach, Canton of Bern 2009

VX140-H4 was designed to perfectly fit within the stream.

토석류 및 산사태 방호 시스템 - Trachtbach, Canton of Bern 2009

A light step excavator was used for drilling the anchors and the subsequent assembly of the ring net.

 

System length

15 m - 37 m

 

Year of installation

2009

Situation

The historic village of Brienz is built on an alluvial fan at the foot of a large catchment area. In 2005, after a period of extraordinarily heavy precipitation, the Trachtbach carried enormous amounts of debris and buried several buildings, a road and a tourist railway. To prevent similar impacts in future, the torrent was tamed with a combination of different protection measures including the GEOBRUGG debris flow barriers.

Description

The three VX ring net barriers in the Trachtbach have an almost identical flume geometry. All three barriers can retain a volume of 4,000 m³ for a total retention capacity of 12,000 m³.

The VX ring net barriers are dimensioned with a a clearly defined overflow section so there is no risk of the debris flow material breaking laterally. The abrasion plate protects the top of the barrier from potential damage by debris that may be present in subsequent flows and overflows. For drilling the anchors and the subsequent assembly of the ROCCO ring nets, a light step excavator was utilized. No heavy machinery was required for assembling the anchorages.

VX140-H4 dimensions:
Barrier 1: bottom width 5.5 m / top width 15 m
Barrier 2: bottom width 6.5 m / top width  17 m
Barrier 3: bottom width 7.0 m / top width  20 m

The single UX160-H4 barrier has a retention volume of 6,000 m³. The bottom width of the barrier is 16 m and the top width is 37 m.

In the event of complete barrier activation, the four barriers together provide an unfilled retention capacity of 18,000 m³.

Customer

Political Community of Brienz

Protected object

Road, Building

Engineering

Kellerhals + Haefeli, Berne

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail