미국
미국

myGeobrugg

El Florido - Los Ranchos. Km24

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos. Km24 2019

Overview of barrier SL-150

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos. Km24 2019

Our expert is inspecting the barrier

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos. Km24 2019

The road is safer thanks to the barrier

토석류 및 산사태 방호 시스템 - El Florido - Los Ranchos. Km24 2019

Shallow landslides can no longer block the road

 

Systems

 

System length

62 m

 

Year of installation

2019

Situation

The road at km 24+000 Sector 2, Los Ranchos - El Florido, was periodically affected by landslides.

Description

Today a shallow landslide barrier SL-150 controls landslides.

Customer

BCIE

Contractor

Gabriel Couto

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

ACI

Subcontractor

ICA Inversiones

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail