myGeobrugg
During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.
To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.
Check also the Piwniczna Zdrój DW97 slope protection project.
폴란드
GDDKiA Oddział Kraków
BMD Sp. z o.o.
BMD Sp. z o.o.
Galvanized