미국
미국

myGeobrugg

Chenani Nashri Tunnel Portal (2016)

낙석방호시스템 - Chenani Nashri Tunnel Portal (2016) 2016

Finished line of GBE-500A rockfall barrier above the Chenani Nashri Tunnel

낙석방호시스템 - Chenani Nashri Tunnel Portal (2016) 2016

Overview of the tunnel portal construction site - GBE-500A rockfall barrier line visible on the top

낙석방호시스템 - Chenani Nashri Tunnel Portal (2016) 2016

GBE-500A after installation, slopes below are being cut

낙석방호시스템 - Chenani Nashri Tunnel Portal (2016) 2016

GBE-500A after installation, slopes below are being cut

 

Systems

 

시스템 길이

80 m - 91 m

 

설치 년도

2016

Situation

The site was initially proposed to be treated with shotcrete but persistent seepage of water which caused slope failures and cracks on the portals led the concessionaire to go for an alternate solution which does not only stabilize the slopes but also offers a green solution and allows the hydrostatic pressure to disperse. National Highways Authority of India decided to actively stabilize the tunnel portals. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

As an extra safety measure, 500 kJ barrier line was introduced and placed on one of the berms to provide extra safety besides portal stabilization. Rockfall barriers protect agains rockfalls from above stabilized area.

Description

The GBE-500A rockfall barrier system protects the entry and exit levels of the Chenani Nashri Tunnel from all sorts of major and minor rockfalls or any falling object which could in anyway harm the tunnel portals and traffic. Thus it helps reducing the risks involved as well as the complete protection from rockfall based calamity.

See also our slope project Chenani Nashri Tunnel Portal (1)

Country/Region

인도

Customer

N.H.A.I. (National Highways Authority of India)

Engineering

GeoData Consultants for Leighton Wellspun Contractors Pvt. Ltd.

Contractor

Leighton Welspun Contractors Pvt. Ltd.

Protected object

Road, Infrastructure

부식방지

Galvanized, GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi
 

Saleh Feidi

자연 재해
수리학
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국

이메일

John Kalejta
 

John Kalejta

자연 재해
수리학
Geobrugg North America, LLC,KS 67226 Wichita / 미국

이메일

Bob Lyne
 

Bob Lyne

자연 재해
수리학
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

이메일

Tim Shevlin
 

Tim Shevlin

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국

이메일