Fierza Hydroelectric Power Station #2

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

토석류 및 산사태 방호 시스템 - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

Systems

 

시스템 길이

40 m - 75 m

 

설치 년도

2014

Situation

Shallow landslides were slipping into the lake and surrounding road.

Description

Landslide protection with shallow landslide barriers SL-150.

Country/Region

알바니아

Customer

KESH Albania

Engineering

-

Contractor

Cresta Geo Switzerland

Subcontractor

-

Protected object

Road, Building

부식방지

Galvanized

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi, Regional Manager California
 

Saleh Feidi

자연 재해
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국 , Regional Manager California

이메일

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

자연 재해
Geobrugg North America, LLC,KS 67226 Wichita / 미국 Regional Manager Rocky Mountains / Central USA

이메일

Bob Lyne
 

Bob Lyne

Regional Sales Manager Southeast

자연 재해
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국 Regional Sales Manager Southeast

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

이메일

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국 Regional Sales Manager Pacific Northwest and Hawaii

이메일