스위스
스위스

myGeobrugg

El Jocotillo electrical substation

비탈면 보강 시스템 - El Jocotillo electrical substation 2015

View of the slopes around the power station stabilized with TECCO® SYSTEM3.

비탈면 보강 시스템 - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 perfectly stabilized very steep slopes.

비탈면 보강 시스템 - El Jocotillo electrical substation 2015

Another perspective of the electrical substation.

비탈면 보강 시스템 - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 installation: TECCO® G65/3 secured using system spike plates P33/40.

 
 

Year of installation

2015

Situation

A slope of highly fractured and weathered volcanic rock with continually falling rocks endangered the security of an electrical substation at the bottom of the rock cutting.

Description

Slope stabilization with TECCO® system and anchor bolts D25 [mm] and length 4 [m].

Customer

Eolic San Antonio

Contractor

Grupo PHI S.A.

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Grupo PHI S.A.

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail