Bassin d'Antiquailles - Tranchée rocheuse

비탈면 보강 시스템 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Stabilization of the rock face with the TECCO G65/3 system

비탈면 보강 시스템 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Anchors positioned in the cavities ensure proper tensioning of the mesh

비탈면 보강 시스템 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Transition between the concrete frame and the stabilized slope

비탈면 보강 시스템 - Bassin d'Antiquailles - Tranchée rocheuse 2022

The mesh adapts to different ground profiles, here rocky and loose areas

 
 

설치 년도

2022

Situation

In case of a big flood in the region, a trench was planned to allow the transfer of water to temporary storage (quarry).
The trench is partly equipped with a reinforced concrete framework, while a linear of about 60 meters remains in the open air and must be reinforced to avoid landslides

Geology

Calcaire

Description

The exposed rock face has fractured planes that can generate local instability. TECCO system, consisting of a G65/3 mesh associated with a P33 spike plate, was selected.
The resistance of the TECCO G65/3 mesh allowed us to propose a flexible-facing solution adapted to the site.

Engineering

Contractor

Protected object

Infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

이메일

Olivia Sartorius
   

Olivia Sartorius

자연 재해
수리학
광산 / 터널
Geobrugg AG

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스

이메일