Situation

Granulats Vicat planned to build a connecting tunnel to access the La Courbaisse quarry from the Tinée Valley. Protection works against falling stones, blocks, and rock masses had been organized to protect the personnel and the installations, equipment, machines and materials at the level of the two heads of the future.

Description

The installation of two rockfall deflectors, ATT-20 (80 meters) and ATT-40 (90 meters), and a GBE-500 rockfall protection barrier (120 meters), in addition to the purging, mining and reinforcement work previously carried out on the cliff, ensured that the expected level of safety was achieved.

System height

ATT-20: net 12 m, posts 4 m

ATT-40: net 21 m, post 5 m

GBE-500: 5 m


System length

ATT-20: 80 m

ATT-40: 90 m

GBE-500: 120 m

Country/Region

프랑스

Customer

Engineering

BG Ingénieurs Conseil

Contractor

Protected object

Mine / Quarry

부식방지

Galvanized

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi
 

Saleh Feidi

자연 재해
수리학
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국

이메일

John Kalejta
 

John Kalejta

자연 재해
수리학
Geobrugg North America, LLC,KS 67226 Wichita / 미국

이메일

Bob Lyne
 

Bob Lyne

자연 재해
수리학
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

이메일

Tim Shevlin
 

Tim Shevlin

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국

이메일