스위스
스위스

myGeobrugg

IRCON Tunnel 7 -P2, Teesta Bridge, Sivok Rangpo Railway

낙석방호시스템 - IRCON Tunnel 7 -P2, Teesta Bridge, Sivok Rangpo Railway 2021

Rockfall barrier protecting the tunnel portal

낙석방호시스템 - IRCON Tunnel 7 -P2, Teesta Bridge, Sivok Rangpo Railway 2021

Patel Rangpo before installation; exposed slope, Tunnel 7 -P2, near Teesta bridge National Highway-10, West Bengal

낙석방호시스템 - IRCON Tunnel 7 -P2, Teesta Bridge, Sivok Rangpo Railway 2021

After installation: commuters on National Highway 10 are protected by GBE-2000A rockfall protection barrier

낙석방호시스템 - IRCON Tunnel 7 -P2, Teesta Bridge, Sivok Rangpo Railway 2021

Completed installation of the rockfall barrier

 

Systems

 

시스템 길이

120 m

 

설치 년도

2021

Situation

The Indian Northeast Frontier Railway (NFR) was building a new railway line at Rangpo in West Bengal,  near Teesta bridge. During construction the slope at the tunnel portal became instable causing rockfall.

Geology: Moderately to highly weathered Claystone/Shale & Sandstone/Siltstone. With overburden of clayey silt with gravels and boulders.

Inclination of the slope: 50° to 60°

Description

Work started with drilling for anchors in April 2021 and was completed with installing a GBE-2000A rockfall barrier in June 2021.


Trained professionals carried out the installation under the supervision of Geobrugg India Pvt. Ltd. It ensures maximum safety with correct methodology, guiding the site engineers and sub-contractors for optimum effects and results.

Country/Region

인도

Customer

Patel Engineering Limited (PEL), INDIA

Contractor

M/s Pioneer Foundations Engineers

Protected object

Railway

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
모니터링
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일