Svizzera
Svizzera

myGeobrugg

Protezione da caduta massi - Coal Mine 2021

Completely installed rockfall barrier GBE-100A-R

Protezione da caduta massi - Coal Mine 2021

Rainfall washed out the soil, causing rockfalls

Protezione da caduta massi - Coal Mine 2021

Anchor of the barrier

Protezione da caduta massi - Coal Mine 2021

Upper part of the rockfall protection fence

Protezione da caduta massi - Coal Mine 2021

Inspection - 461 meters of rockfall fence were installed

 

Sistemi

 

Lunghezza del sistema

24 m - 132 m

 

Anno di installazione

2021

Situazione iniziale

The mine has an impressive safety record and has won the group Chairman’s Safety Shield for its consistent improvement and the group CEO Safety Award for the best safety record of all group operations worldwide.
Required was a protection of the portal / entrance to the underground operation against rockfalls and masses of soil from erosion of the upper benches.

Descrizione

It was decided to install GBE-100A-R rockfall barriers; height is 2 meters, total barrier length of the five barriers is 461 meters.

  • 1 GBE-100A-R, 77 m long
  • 2 GBE-100A-R, 108 m long
  • 3 GBE-100A-R, 24 m long
  • 4 GBE-100A-R, 120 m long
  • 5 GBE-100A-R, 132 m long 

Paese / Regione

Sudafrica

Cliente

n.a.

Contraente:

Oggetto protetto

Cava / Miniera

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera

E-mail