Suisse
Suisse

Gamsgrubenweg, Grossglockner

Grossglockner, Autriche
2013
Client
Grossglockner Hochalpenstrassen AG
Ingénierie
Ingenieurbüro Tschernutter Consulting GmbH
Entrepreneur
Felbermayr Bau GmbH
Objet protégé
Route/Rue
Classe énergétique
1000 kJ
Hauteur du système
1.0 m, 1.5 m
Protection anticorrosion
GEOBRUGG SUPERCOATING
Situation de départ

To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.

Description

The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.

Votre contact local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Exploitation minière / Tunnel
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suisse
Téléphone 071 466 81 52
Mobile 078 783 46 81

E-mail

René Müller
René Müller
Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG
Industriestrasse 21
5200 Brugg / Suisse
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Suisse