Slope Stability - DB SoFo Kestert 2021

After the rockfall, the area was stabilized with mesh

Slope Stability - DB SoFo Kestert 2021

After the 15'000 tons rockfall event

Slope Stability - DB SoFo Kestert 2021

6'500 square meters were stabilized

Slope Stability - DB SoFo Kestert 2021

Upper line of the netting

 
 

Year of installation

2021

Initial situation

In March 2021, a rockfall of around 15,000 tons occurred near Kestert. The track and the road underneath had to be closed.

Description

After scaling and clearing works, the protective netting was installed. The nailings are between six and twelve meters long. Other at-risk sections were secured with SPIDER S3-130 and SPIDER S4-130.

Country/Region

Germany

Customer

Engineering

Contractor

Feldhaus Bergbau GmbH & Co. KG, Karl-Heinz Schneider Baugeschäft GmbH, Schönberger Bau GmbH & Co. KG

Protected object

Road, Railway

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail