Schweiz
Schweiz

Codelco El Teniente Copper Mine

Sewell, Rancagua, Chile
2016
Kunde
Codelco - the National Copper Corporation of Chile / El Teniente mine
Subunternehmer
Salfa Montajes (Salfacorp S.A.) / Züblin International GmbH Chile SpA
Geschützte Objekte
Steinbruch / Bergbau
Korrosionsschutz
GEOBRUGG SUPERCOATING
Nagellänge
4 m
Nagelmuster A
1 m / 1 m
Ausgangslage

El Teniente in Chile is the world largest underground copper mine.  Due to specific rock conditions, the risk of rock bursts is very high.  Since security standards at Codelco are amongst the highest worldwide, margins for failure from rock bursts are very low.  In the past, several rock bursts have affected personnel and operations.

Massnahme

To protect people and equipment at El Teniente, a combination of shotcrete with MINAX® 65/4 and/or MINAX® 80/4 was used.  This solution was successfully tested at Geobrugg's dynamic test center in Walenstadt, Switzerland.  Results were above satisfactory.

In addtion to the MINAX® mesh, installation was completely mechanized with Geobrugg's handler called, MESHA®.  MESHA® increases safety and the efficiency of the ground.

Ansprechpartner

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Naturgefahren, Uferschutz, Minen / Bergbau / Tunnel
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Schweiz
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Naturgefahren, Minen / Bergbau / Tunnel
Geobrugg AG
Industriestrasse 21
5200 Brugg / Schweiz
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Naturgefahren, Minen / Bergbau / Tunnel
Geobrugg AG
Stabile Cometal, via Pizzante 7
6595 Riazzino / Schweiz