Zagreb-Rijeka Railway Line - Tunnel Meja

Stabilizacja skarp - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

Installation of the high tensile TECCO® G65/4 mesh on the slope - visible nail pattern and TECCO® SYSTEM³ spike plates

Stabilizacja skarp - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

Overview of the construction site - on the right the old solution with visible gabion mesh which turned out to be not sufficient for the conditions. TECCO® SYSTEM³ was designed to be placed over the old layer of mesh

Stabilizacja skarp - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

Drilling works were executed through the old layer of gabion mesh being already strongly fatigued

Stabilizacja skarp - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

TECCO® SYSTEM³ protecting slope - visible the pre-tensioning on some nails which allows following the morphology very tight

Stabilizacja skarp - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

TECCO® SYSTEM³ protecting slope along the railway line directly next to the Meja Tunnel

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2017

Sytuacja początkowa

The revision works at the railway line no. M202 Zagreb-Rijeka were done together with the installation of a slope protection system. In the past, regularly occurring rock falls limited the speed of the trains.

Geologia

Limestones covered by scree

Opis zastosowanego rozwiazania

When designer Vanja Kovačević received data from the geologist, he chose TECCO® G65/4 for this slope protection. TECCO® G65/4 was combined with 4 meters long self-drilling nails (32/21 mm) and 6 to 14 meters long nails (51/34.3 mm).

This is the first TECCO® G65/4 installation in Croatia.

Inwestor

Croatian Railway

Wykonawca

Swietelsky d.o.o. Zagreb

Chroniony Objekt

Railway

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Elektroprojekt d.d. Zagreb (Krešo Ivandić and Vanja Kovačević)

Inne przedsiębiorstwa

Octopus-Rijeka d.o.o. Rijeka

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy