USA
USA

myGeobrugg

Ochrona przed obrywami skalnymi - Ware Road 2024

Completed debris fence with a height of 5.2 metres

Ochrona przed obrywami skalnymi - Ware Road 2024

Completed debris fence between buildings and rockface

 

Zastosowane systemy

Specjalne rozwiązania

 

Dlugosc systemu od

18 m

 

Rok Instalacji / Montazu

2024

Sytuacja początkowa

On-site, a chalk cliff face had begun, causing a rockfall hazard to the residential buildings and car parking area beneath the rock face.

Small amounts of debris had fallen from the cliff face, impacting and overtaking the existing green palisade fence on-site.

Due to the ownership of the area above the cliff and the cliff itself, no work could be done directly on the cliff face. However, the hazard to the properties below still remained.

RSK Geosciences acted as the designer for the rockfall hazard assessment and mitigation on the project.

Opis zastosowanego rozwiazania

Geobrugg worked closely with RSK to understand the rockfall risk present on site. After establishing the expected low energy capacity of the rockfall (5 kJ) and the expected small debris size, an alternative solution was needed for a standard rockfall barrier. It was also determined multiple rockfall events were a possibility. 

One issue was that the projected rockfall height, although low energy, was expected to be around 5 metres, leaving the site needing a lightweight fence that is low energy but also appropriately high.

For this solution, Geobrugg adapted its debris fence with permanent foundations. The mesh type was changed to lightweight, low-aperture TECCO G45/2 to provide the appropriate energy capacity for rockfall on site and the ability to stop smaller rockfall.

An additional adjustment of the fence was required. Due to the expected rockfall height, the crank arm of the debris fence was extended from 0.3 to 1.5 metres, giving a total fence height of 5.2 metres.

CAN Geotechnical as a contractor installed the solution. They worked in difficult site conditions, with restricted access and limited lifting ability due to existing buildings.

Kraj / Region

Zjednoczone Królestwo

Projektant

Chroniony Objekt

Residential area

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

Kevin Coyle
 

Kevin Coyle

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Regional Manager California

Formularz kontaktowy

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

Formularz kontaktowy

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

Formularz kontaktowy