Ochrona przed obrywami skalnymi - Valley of Tempe 2010

Overview of the construction site showing the importance for the protection measures

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

Fatal accident in the Valley of Tempe, main trigger for the further installed measures

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

Another rockfall accident in the Valley of Tempe

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road. Rockface is actively stabilized

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) and below road destroyed by rockfall

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) - below visible road reconstruction works

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

RX-300 rockfall barrier (for 3000 kJ) installation works

Ochrona przed obrywami skalnymi - Valley of Tempe 2010

Road view just after all works implementation

 

Dlugosc systemu od

50 m - 300 m

 

Rok Instalacji / Montazu

2010

Sytuacja początkowa

Témpi (also Tembi / Tembe / Τέμπη) Valley is the last remaining bottleneck along the Athens - Thessaloniki Motorway.  20,000 cars  pass by the eight kilometer long gorge each day. After two consecutive fatal rockfall events, the Agean Motorway SA closed the road in agreement with the ministry of street.

Opis zastosowanego rozwiazania

Olympia Joint Venture signed a contract with Geobrugg to execute emergency rockfall mitigation measures with the aim to re-open the road for two weeks during Easter time. The remaing part of the work was to be completed by the end of May 2010.  In order to meet the deadline, 30 workers, six boomlifts, two truck cranes, six compressors and a helicopter were necessary.

Dangerous rock slopes were actively stabilized using TECCO® SYSTEM³ and SPIDER®.  A series of rockfall barriers were installed along the road.

Inwestor

Olympia Joint Venture (Aktor – Hochtief)

Wykonawca

Olympia Joint Venture (Aktor - Hochtief)

Chroniony Objekt

Road

Ochrona przeciwerozyjna

Galvanized, GEOBRUGG SUPERCOATING

Projektant

Omikron Kappa Consulting S.A.

Inne przedsiębiorstwa

Crestageo AG, Geobrugg Italia Srl, Geobrugg Ibérica & Morocco S.A.U.

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy