Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

Tunnel T10 P1 - Bhanupali - Bilaspur - Beri New Railway Line, India

Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

Location before stabilizing measures

Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

Situation at the site after rainfalls

Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

Site Strata

Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

Drilling and unrolling of mesh at the site

Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

Nuts on P33 Spike Plates

Stabilizacja skarp - Tunnel 10, Bilaspur, RVNL 2025

TECCO® G65/4 installed

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2025

Sytuacja początkowa

The project is located along the Bhanupali–Bilaspur–Beri New Railway Line, spanning across the states of Punjab and Himachal Pradesh in northern India. The specific work site, Tunnel T10P1, lies within a hilly and geologically sensitive stretch near the boundary of Rupnagar District and Bilaspur District.

This region forms part of the Shivalik hill range, characterized by steep slopes, fractured rock formations, and susceptibility to erosion and rockfall activity. The terrain is influenced by seasonal rainfall, which further contributes to slope instability and necessitates robust protection measures.

Opis zastosowanego rozwiazania

Slope stabilization has been carried out using high-tensile steel wire mesh TECCO G65/4 and spike plates, selected for its superior strength and load-bearing capacity in fractured and weathered rock conditions. The mesh provides active stabilization by securely holding loose and unstable rock blocks against the slope surface.

The mesh combined with rock anchors and spike plates to ensure uniform load distribution across the system. This combination enables efficient transfer of forces from the unstable rock mass to the anchoring system, preventing localized failures and enhancing overall stability.

The high-strength characteristics of the mesh also allow for optimized anchor spacing, while its durability ensures long-term performance with minimal maintenance in the challenging site conditions.

Kraj / Region

Indie

Inwestor

Rail Vikas Nigam Limited

Chroniony Objekt

Railway

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

Saleh Feidi
 

Saleh Feidi

Regional Sales Manager California and Nevada

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Regional Sales Manager California and Nevada

Formularz kontaktowy

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / USA Regional Sales Manager Northeast

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

Formularz kontaktowy

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

Formularz kontaktowy