Stabilizacja skarp - Schwäbisch Gmünd 2015

Overview of the stabilized slope with area for future building foundation in the back

Stabilizacja skarp - Schwäbisch Gmünd 2015

Fresh cut after nailing - visible erosion prone ground conditions

Stabilizacja skarp - Schwäbisch Gmünd 2015

Hydraulic piling machine used on the project

Stabilizacja skarp - Schwäbisch Gmünd 2015

Installation of the TECCO® SYSTEM3 and anti-erosion mat. Visible piling activity in the background

Stabilizacja skarp - Schwäbisch Gmünd 2015

.

Stabilizacja skarp - Schwäbisch Gmünd 2015

Tallest slope area after hydroseeding

Stabilizacja skarp - Schwäbisch Gmünd 2015

Fully protected slope after hydroseeding. Pile wall visible at the base of the slope.

Stabilizacja skarp - Schwäbisch Gmünd 2015

Revegetation on the fully protected slope during building construction

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2015

Sytuacja początkowa

The developer was planning several residential buildings on the hillside north of the river Rems in Schwabisch Gmund (near Stuttgart). The pit was created with a pile wall for excavation support. This area was backfilled after the buildings were completed. In the upper slope area, which remains visible; however, the developer chose to implement a solution that allows revegation.

Geologia

The slope incision is located in the Stubensandstein layer, and is therefore partly based on stiff loams.

Opis zastosowanego rozwiazania

For dimensioning the nail grid pattern global stability was observed and recorded first. In a second step the near-surface instabilities were dimensioned. As is typical for most excavation activity, this slope was excavated from the top down in 1.5 m increments. Immediately following excavation the erosion control mat and TECCO® System were anchored in place with soil nails.

The solution was chosen because:

- Cohesive soils / grounds with an appropriate supply of nutrients for successful revetation,

- Active and immediate greening of the embankment by hydroseeding,

- Through future building the slope will be shaded,

- Four years ago, a similar project using TECCO® System was completed nearby and has shown successful revegetation.

Inwestor

((... wil be completed by STS/GRE))

Chroniony Objekt

Building

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Inne przedsiębiorstwa

Sidla & Schönberger Spezialtiefbau GmbH

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy