Szwajcaria
Szwajcaria

myGeobrugg

Stabilizacja skarp - Schmerikon State Road 17 2013

Bird's eye view of the protected objects: State roadway, railway, bicycle path, building and port

Stabilizacja skarp - Schmerikon State Road 17 2013

Slope failure seen shortly after the emergency work began a few days after the incident in June 2013

Stabilizacja skarp - Schmerikon State Road 17 2013

Spider excavator during drilling

Stabilizacja skarp - Schmerikon State Road 17 2013

Drilling along the top edge of the failed slope

Stabilizacja skarp - Schmerikon State Road 17 2013

Drilling with manual equipment

Stabilizacja skarp - Schmerikon State Road 17 2013

View of the upper section showing nailed TECCO G65/3, P33 spike plates and border rope

Stabilizacja skarp - Schmerikon State Road 17 2013

Location: Zürichsee, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2013

Sytuacja początkowa

In the first days of June 2013 heavy storms and intense rainfall hit the region of the upper lake of Zurich. Due to saturation of the ground and instable geological conditions, a landslide buried a long section of heavily travelled commuter roadway and railway along the lake. This landslide caused complete closure of the infrastructure.

Geologia

Top Section: weathered marl

Bottom section: weathered sandstone / siltstone

Opis zastosowanego rozwiazania

The department for underground construction initiated re-establishment and sustainable prevention of future similar incidents a few days later. To reach a quick decision and accelerate the construction, the department quickly involved local and regional partners.

Solutions discussed were rockfall barrier, manifold, or anchored TECCO® System the most favorable and ultimately chosen solution.

The upper slope section (marl) was protected and stabilized using a nailed mesh. The lower sandstone/siltstone section was covered with a drape to ensure that falling debris is kept close to the slope while being guided and deposited to the ditch.

Inwestor

State Department for Underground Engenieering, Canton St.Gallen

Wykonawca

Oberholzer Bauleistungen Inc., Neuhaus, Switzerland

Chroniony Objekt

Road, Railway, Infrastructure

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Dr. A. Gübeli AG, Jona, Switzerland

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy