Stabilizacja skarp - Schänis, State Road 17 2016

Installation using a mobile drill rig

Stabilizacja skarp - Schänis, State Road 17 2016

Installing a section towards south-east, before placing the spike plates

Stabilizacja skarp - Schänis, State Road 17 2016

Protected object: Quiet during the day, very congested during rush-hour

Stabilizacja skarp - Schänis, State Road 17 2016

Risk of toppling rocks is a thing of the past: SPIDER® ensures safe traffic (view of the north-eastern section)

Stabilizacja skarp - Schänis, State Road 17 2016

Location: Linth Plain, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2016

Sytuacja początkowa

The area was formed by glaciers. With climate change, the rock underneath, molasse conglomerate rock, has become more unstable. During the past few years sections of rock, some with volumes of around 1 m³, became dangerously loose and were in danger of eminent fall onto the road, the building below and the neighboring pastures.

The Swiss State Agency for Forest and Natural Hazards immediately alerted the regional road inspectorate and political community to the potential risk.

Geologia

Instable blocks of molasse conglomerate.

Opis zastosowanego rozwiazania

As a short term emergency measure Geobrugg worked with the regional road administration and a local contractor to stabilize the most critical rock sections with SPIDER® S3-130.

As a long-term solution that ensures safe driving conditions for daily commuting, an anchored system was installed. Along the deep chasms all along the molasse bar, three levels of anchors were drilled. The higher and lower levels were drilled to a length of 4 m while the anchors of the middle rows were drilled to a length of 7 m. These anchors were drilled to a grid that measures 2.15 m x 2.15 m.

The whole project from planning to final acceptance took only six weeks.

Inwestor

State Department for Underground Construction, Canton St.Gallen, Switzerland

Wykonawca

Oberholzer Inc., Neuhaus, Switzerland

Chroniony Objekt

Road, Building

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Geobrugg AG, Geohazard Solution

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy