San Francisco Tunnel Los Bronces Access Protection

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal, Line 1 (60 m SL150)

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

Engineering study

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

General view, South Sector

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal Line (60 m SL150)

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal line 2 (114 m SL150)

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, South Portal line 1

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, South Portal line 2

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

General view, north sector

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

First works North Portal

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, North Portal

Kopalnie / Wydobycie / Tunel - San Francisco Tunnel Los Bronces Access Protection 2018

North Portal barrier (66 m, SL150)

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2018

Sytuacja początkowa

The San Francisco River is one of the main tributaries of the Mapocho River that crosses the city of Santiago. This river originates and passes the surroundings of the mining site Los Bronces de Anglo American, located in the middle of the Andes Mountain Range. Within its route, the river crosses a tunnel that makes a bypass through the old tailings pond of the mining site.

In summer, this sector is prone to rainfall, producing landslides that block the entrance and exit portals of the tunnel, affecting the riverbed and generating a significant environmental impact when it comes into contact with the tailings pond material.

Opis zastosowanego rozwiazania

To protect the portals, a long-term plan has been designed. It begins with mitigation works for the landslides that occurred in the vicinity of the portal. For this purpose, an engineering project was initially developed to model the water flows in the streams and then implement a solution with multiple shallow landslide barriers protecting both portals of the tunnel. The barriers will avoid future environmental impacts due to the diversion of the river waters.

Kraj / Region

Chile

Inwestor

Anglo American - Los Bronces

Projektant

Geotest

Wykonawca

Pucará

Chroniony Objekt

Mine / Quarry, Infrastructure, Other

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Project Manager Sales Eastern Switzerland

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy