USA
USA

myGeobrugg

Stabilizacja skarp - Pécs, Nationalroad 66 2011

DELTAX® G80/2 high tensile steel mesh during installation - thanks to very low weight and chain-link structure the mesh can be installed very fast

Stabilizacja skarp - Pécs, Nationalroad 66 2011

Overview of the situation before installation

Stabilizacja skarp - Pécs, Nationalroad 66 2011

Unrolling of the DELTAX® mesh G80/2 with rolls of 3.5 m x 30 m and a weight of 68 kg only

Stabilizacja skarp - Pécs, Nationalroad 66 2011

The mesh is practically invisible on the slope

Stabilizacja skarp - Pécs, Nationalroad 66 2011

Simple anchors were drilled manually

Stabilizacja skarp - Pécs, Nationalroad 66 2011

Simple border ropes anchoring using rebars as driven nails

Stabilizacja skarp - Pécs, Nationalroad 66 2011

Top support rope and DELTAX® G80/2 mesh overlap on the top of the slope

Stabilizacja skarp - Pécs, Nationalroad 66 2011

View from the top of the secured slope - DELTAX® G80/2 offers both: low visibility and also very easy installation (no heavy equipment required)

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2011

Sytuacja początkowa

As part of the expansion of the National Road 66 leading north from Pécs, the provision of slope protection against rock fall was put out to tender. Due to the fact that traffic should be impeded only minimally by the installation and that the contractor Gradexpresented an offer that was convincing both technically and commercially, the contract was awarded to this company at the beginning of October 2011

Opis zastosowanego rozwiazania

This 5000 m² installation was the first time that the contractor installed DELTAX® mesh. Due to its low weight, a smooth unrolling and fast shortening of rolls, as well as an easy splicing of rolls, a quick and unproblematic installation was possible. Subsequent to careful preparation of the site, it was possible to lay and secure all 5000 m² in just two days. This not only saved costs for the contractor but also impressed the road authorities.

Inwestor

Magyar Aszfalt Ltd.

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG ULTRACOATING

Projektant

VIA Futura Ltd.

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy