USA
USA

myGeobrugg

Obre Biel, Matterhorn Gotthard Bahn

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

Multi Hazard Barrier protecting Matterhorn Gotthard Railway line against rockfalls, snow slides and smaller avalanches

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

Finite elements based simulation software FARO allowed the correct barrier dimensioning according to the customer requirements

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

Drilling works using walking excavator equipped with drill rig

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

Drilling with casing was necessary due to poor ground conditions and thus unstable drill holes

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

Multi Hazard Barrier during installation - visible already positioned posts with retaining and lateral ropes

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

ROCCO® ring net installation using shackles

Ochrona przed obrywami skalnymi - Obre Biel, Matterhorn Gotthard Bahn 2016

Fully installed Multi Hazard Barrier with special gap filling adjustment

 

Dlugosc systemu od

28 m - 112 m

 

Rok Instalacji / Montazu

2016

Sytuacja początkowa

The railway line Matterhorn Gotthard has a section called Obre-Biel that is being used by as many as  ten passanger trains per hour, along with cargo trains. Over the years, this section of the railway has been inundated by snow slides and smaller avalanches. Consequently, railway traffic has been severly impaired and has also created the danger of possible trail derailment. The line was also endangered by rockfalls.

 

 

Opis zastosowanego rozwiazania

The soution shall protect the railway line against snow slides, snow avalanches and rockfalls. Choosing flexible rockfall barriers willl decrease the amount of traffic disturbances.

Standard rockfall barriers are designed to deal with loads caused by rockfalls. So, to serve as a mutli-hazard protection system, some special dimensioning has to be implemented.

Such special dimensioning is not possible without involving computer simulations. For this purpose, Geobrugg uses finite element simulation software called FARO. FARO was originally developed by the Swiss Federal Institute for Forest, Snow and Landscape Research, and WSL, in order to simulate rockfall barriers with ring nets.

Further software development financed by the Commision for Technology and Innovation CTI allowes surface load simulations caused by debris flows, shallow landslides and avalanches.

By using FARO software, a total of 182 meters of rockfall barriers were correctly dimensioned to protect the railway line. They were finally divided into three lines of 112, 42 and 28 meters.

Inwestor

Matterhorn Gotthard Bahn (MGB)

Wykonawca

ABA Bautec AG

Chroniony Objekt

Railway

Ochrona przeciwerozyjna

Galvanized, GEOBRUGG SUPERCOATING

Projektant

geoformer igp AG (wasser/schnee/lawinen - André Burkard AG)

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy