Ogrodzenia drogowe: na place budowy, remonty tuneli lub imprezy publiczne

Our road fences keep people and infrastructure safe on construction sites, temporary road closures and other areas. The rapid setup of the system in combination with high energy absorption presents the ideal solution to many different applications. The system has passed all tests for homologation in motorsports by the FIA.

The Geobrugg mDF350-2 system is consisting of Geobrugg panels and NORDBETON concrete barriers. Ready prepared connection elements and sleeves in the NORDBETON barrier allow a fast and easy installation.

The concrete elements come ready prepared with sleeves for Geobrugg panel installation and connection elements to link the barriers together. Gates for car or pedestrian access are available and can be simply fixed to the barrier. Thanks to the modular system, extensions and modifications can be implemented at any time.

Siatka z drutu o wysokiej wytrzymałości na rozciąganie

Zabezpieczenie przed uderzeniem o wysokiej energii: Drut ze stali o wysokiej wytrzymałości na rozciąganie wynoszącej 1,770 N/mm², umożliwia maksymalną absorpcję obciążenia przy minimalnym odkształceniu.

Quick and easy installation

Our mobile street fences are easy to install. Delivery time within Europe is 2 weeks.

Relocatable

Our design is made for easy relocation.

FIA homologated

Our barriers are homologated by FIA and are FIM accepted. They are used worldwide on race tracks.

Pliki do pobrania

Videos

Mobile Road Fence Testing with a truck

Referencje

To the project
Defereggental L25 - temporary barrier

St. Veit in Tirol, Austria

 

Zastosowane systemy

Specjalne rozwiązania

 

Rok Instalacji / montazu

2020

To the project
Katschbergstrasse B99 (1)

Kreuzbergmaut, Austria

 

Zastosowane systemy

Mobile Debris Fence

 

Dlugosc systemu

40 m

 

Rok Instalacji / montazu

2019

To the project
Moffet Creek, Oregon, T35 barrier on concrete guardrail

near Moffet Creek, Oregon, USA

 

Zastosowane systemy

T35

 

Dlugosc systemu

100 m

 

Rok Instalacji / montazu

2018

To the project
Bodenberg B21

Schneizlreuth, Niemcy

 

Zastosowane systemy

Mobile Debris Fence

 

Rok Instalacji / montazu

2020

To the project
ATIVA - Highway Turin Aosta, Quissolo

Quissolo, Włoch

 

Zastosowane systemy

Specjalne rozwiązania

 

Rok Instalacji / montazu

2016

Kontakt

Roger Moor
     

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
René Müller
     

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Isacco Toffoletto
     

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel