Szwajcaria
Szwajcaria

myGeobrugg

Stabilizacja skarp - Limestone Stadium Bad Segeberg 2008

SPIDER® System protecting slopes next to spectators' area with minimal visual impact

Stabilizacja skarp - Limestone Stadium Bad Segeberg 2008

Installation during the event season required mobile cranes

Stabilizacja skarp - Limestone Stadium Bad Segeberg 2008

Drilling works using a crane platform for the installation of the SPIDER® S4-230 net

Stabilizacja skarp - Limestone Stadium Bad Segeberg 2008

Rope access works during installation of the mesh

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2008

Sytuacja początkowa

Since 2007, in the Limestone Stadium of Bad Segberg, rock faces were cleared to protect performers and spectators from rockfall.  Unfortunately, this caused considerable damage to the stage and scenery.  There was also a persistent risk that «bulges» over 100 m²  and several meters thick would come loose and crash down without warning.

Geologia

The Kalkberg (limestone mountain) is mainly composed of anhydrite. Under the influence of humidity, dew, and rainfall, this turns to gypsum and increases volume. This process, known as gypsification, creates shell-like «bulges» up to several meters thick which protrude from faults running parallel to the slope.

Opis zastosowanego rozwiazania

Extensive tests and calculations were carried out before the protective work began. Trial anchors were installed to select the most suitable grouting mortar.

The SPIDER® rock protection system was dimensioned with SPIDER ONLINE-TOOL software by the Technical University Freiberg.

Around the stage, the appearance of the rock face could not be altered.  No nets could be hung in this area.  Rock nails with countersunk heads were used instead.

Installation of the SPIDER® rock protection system took place in 2009 and 2010 on several rock faces (e.g., near the cave exit and above the spectators' area).  In some cases, this occurred while events were in progress, in the theater. The rock face heights are between 20 and 30 meters which posed an additional challenge to the contractor, due to limited accessibility. A mobile crane with an attached drilling platform was used for some of the drilling work.

Inwestor

Stadt Bad Segeberg

Wykonawca

Stump Spezialtiefbau GmbH, Niederlassung Chemnitz

Chroniony Objekt

Mine / Quarry, Touristic infrastructure, Sztuka

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Geomontan GmbH, Grossschirma / OT Rothenfurth

Inne przedsiębiorstwa

Geotechnik Projekt, Dr. Ing. Penzel / Technical University Bergakademie Freiberg

Inne zainstalowane aplikacje

Kopalnie / Wydobycie / Tunel

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy