USA
USA

myGeobrugg

Ochrona przed obrywami skalnymi - Kaikōura SH1 - SR8 and 9 2021

ATT looking north side protecting the road

Ochrona przed obrywami skalnymi - Kaikōura SH1 - SR8 and 9 2021

ATT 60 drops stones to the ground in a controlled manner

Ochrona przed obrywami skalnymi - Kaikōura SH1 - SR8 and 9 2021

Top view from the barrier

Ochrona przed obrywami skalnymi - Kaikōura SH1 - SR8 and 9 2021

ATT 60 looking south onto the sea

 

Zastosowane systemy

 

Dlugosc systemu od

110 m

 

Rok Instalacji / Montazu

2021

Sytuacja początkowa

The Kaikōura M7.8 Earthquake caused widespread damage to the road and rail corridor 20 km North and South of the Kaikoura town ship. Over 40 major slips inundated the road and rail with over 750,000 m³ of material form source zones up to 500 m above sea level.  The highly fractured Grey Wacke meant frequent future rockfalls were expected. The rockfall frequency and wide run out area at SR8 and 9 created the requirement for a system that attenuated the rockfall energy to a manageable level, was quick to install and required minimal future maintenance. The Slope on average is approximately 50 degrees but in some parts is near vertical.

Opis zastosowanego rozwiazania

A 110 m wide rockfall attanuator (ATT - 60) with a 35-40 m tail was specified due to its high puncturing resistant yet light weight high tensile (1770 MPa) TECCO 65/4 tail which enables the attenuated material to pass down through to the lower section for clearing if required. The 65 mm aperture is small enough that no secondary mesh is required and the Ultracoating ensures design life in the coastal environment. The attenuator system utilises a 3 m high hinged post with a 16 m spacing and a support rope separation half way.  A double top rope was installed for increased safety in design and Type III flex heads were installed to transfer the load to the Gewi 32 anchor bar. Overall the benefits of an attenuator creating a quick and cost effective solution.

Inwestor

Wykonawca

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG ULTRACOATING

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy