Szwajcaria
Szwajcaria

myGeobrugg

Kaikoura State Highway 1 (SR24/30)

Stabilizacja skarp - Kaikoura State Highway 1 (SR24 30) 2017

(SR24) Looking North West SH1 - slope stabilisation with TECCO® G65/3 ; note the 4 m high RXE-2000 hybrid attenuator with drape

Stabilizacja skarp - Kaikoura State Highway 1 (SR24 30) 2017

(SR30) Looking West SH1 below

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2017

Sytuacja początkowa

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750,000 m³ of material from source zones up to 500 m above sea level.  The highly fractured greywacke meant frequent future shallow landslides had to be expected.

The hazard created the requirement to actively stabilise over ten sites with wire mesh and bolts to be able to reopen the State Higway and the railway below. Ongoing site identification and remediation is expected for several years

Opis zastosowanego rozwiazania

The mesh selected was Tecco® G65/3 ULTRACOATING due to its strength properties, corrosion resistance, low visibility, uniform strength for anchor placement and general ease and speed of installation. To date over 32'000 m² of ultracoated TECCO® 65/3 with galvanised P33/40 spike plates have been installed on eight sites. The mesh was generally anchored using 32 mm solid and self drilling hollow threaded bar anchors in an offset pattern.

Read more about the other Kaikoura projects:

Inwestor

NCTIR / NZTA

Wykonawca

Geoverz, RockControl, Abseil Access, SRG, HGS, Avalon

Chroniony Objekt

Road, Railway

Ochrona przeciwerozyjna

GEOBRUGG ULTRACOATING

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy