Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

The barriers protect the road against rockfalls. Six RXI-500 barriers which can absorb up to 5000 kJ were installed on the site totaling 518 meters with post heights ranging from 6.5 to 8.5 meters. Additionally: RXI-300 (3000 kJ, 70 meters long) and an RXI-200 (2000 kJ, 54 meters long). Slope stabilization with TECCO® G65/3. In total, about 10,200 square meters of slope stabilization and drapery systems were installed on the site.

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

AbAli rockfall zone without protection measures which clearly shows the risks present at the road

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

A specialist from Geobrugg is surveying the site in order to gather the necessary information for the design of the rockfall barriers

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Record of significant rockfall events in the project zone

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Three mobile cranes were drilling and grouting for the project. In total, 8,000 meters of drilling and grouting of boreholes were completed.

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

RXI-500 posts being installed on top of the masonry wall

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

ROCCO® ring nets for RXI-500 (5000 kJ) are being installed using a basket lift with a mobile crane

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Lifting heavy 8.5 meters RXI-500 posts using a mobile crane

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Set-up of the project site in order to control passing traffic

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Example of a significant block being caught during the installation phase!

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Installing a TECCO® drape system in order to stabilize the slope

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

SPIDER® System is applied in order to stabilize a massive block

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Installed barriers on the slope protecting the road against rockfalls

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Final view of SPIDER® System stabilizing a large block

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Example of a rockfall incident at the installed barrier سيستم هاي سنگ گير در پروژه کرج

Ochrona przed obrywami skalnymi - Haraz Road AbAli 2012

Two RXI-500 (5000 kJ) rockfall barriers adjacent to each other

 

Dlugosc systemu od

30 m - 115 m

 

Rok Instalacji / Montazu

2012

Sytuacja początkowa

Haraz is a major route connecting Tehran to the Northen cities in Mazandaran province by the Caspian Sea. As Haraz connects Tehran to the Northern part of Iran, it has to go through Alborz mountains. Along the road, there are many areas with rockfall incidents or slope instabilities.

In AbAli area, the situation was much worse. Massive rockfalls occurred over the course of the years which caused significant damages. Traffic was also increasing year over year and the need to extend the current road & protect it against hazards was a high priority.

Tehran RMTO (Road Maintenance & Transportation Office) considered various solutions in order to stabilize the current situation. Knowing that the road extension project was also in the works, using traditional protection measures such as concrete gallery was in question as it was both very costly and road closures were required.

Opis zastosowanego rozwiazania

In order to identify the riskiest areas, specialists from Geobrugg and Geotech executed a detailed study of all hazards. Rockfall barriers and slope stabilization solutions were developed for each specific area in order to protect the road. (The road was also extended from two lanes to five lanes.)

The protected area was about 650 meters long. A total of eight rockfall barriers with highest energy class of 5000 kJ were installed. Back in 2012 this project definitely set a record in the Middle East - and worldwide!

Inwestor

Tehran Road Maintenance & Transportation Office

Wykonawca

Geotech Company

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Inne zainstalowane aplikacje

Stabilizacja skarp

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy