USA
USA

myGeobrugg

Stabilizacja skarp - Hannafore Road, Looe 2023

View of Hannafore Road in Looe with the slope located above the beach

Stabilizacja skarp - Hannafore Road, Looe 2023

Installed TECCO® G45/2 STAINLESS system with erosion control matting securing the slope

Stabilizacja skarp - Hannafore Road, Looe 2023

Reinforced slope beneath residential buildings, showcasing spike plates, mesh, and surface protection close to the roadway

Stabilizacja skarp - Hannafore Road, Looe 2023

Lateral view of the TECCO® STAINLESS mesh and TECMAT®

Stabilizacja skarp - Hannafore Road, Looe 2023

Close-up of the spike plate with visible vegetation growth through the mesh

Stabilizacja skarp - Hannafore Road, Looe 2023

Vegetation beginning to regrow through the mesh system after the first growing season, blending with the natural surroundings

 
 

Rok Instalacji / Montazu

2023

Sytuacja początkowa

At Hannafore Road in Looe, Cornwall, weathering of the Devonian bedrock beneath a masonry wall had caused slope instability, creating a risk of structural collapse. Located in a popular tourist area, the site required a robust and long-lasting solution to ensure the safety of the adjacent road and infrastructure.

Geologia

Devonian sedimentary rocks (slates, shales and thin limestone)

Opis zastosowanego rozwiazania

To address the instability, Cormac carried out detailed slope modeling using site investigation (SI) data in combination with our RUVOLUM design software. Based on the analysis, TECCO® G45/2 Stainless mesh was selected to provide high-performance stabilization suited to the coastal and corrosive environment. To further support the system, TECMAT was applied for erosion control and slope surface protection.

The later project images highlight the natural vegetation regrowth after just one growing season, demonstrating the solution’s ability to support ecological recovery alongside structural stability.

Kraj / Region

Zjednoczone Królestwo

Wykonawca

Chroniony Objekt

Road, Touristic infrastructure

Ochrona przeciwerozyjna

INOX / STAINLESS

Osoba kontaktowa na miejscu

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Regional Manager California

Formularz kontaktowy

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

Formularz kontaktowy

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

Formularz kontaktowy