Stabilizacja skarp - Greenhithe 2022

View eastwards of slope stabilisation

Stabilizacja skarp - Greenhithe 2022

View southwards from crest of slope

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2022

Sytuacja początkowa

A sudden landslip in November 2021 was the first indication of underlying instability of the existing chalk cutting on the northern side. Immediate reactive works were needed to clear vegetation and underlying chalk material from the cess and track.

Tony Gee was engaged as the designer to engineer a permanent solution to ensure the stability of the cutting going forward. BAM Ritchies were chosen as the specialist geotechnical contractor to install the solution.

Geologia

Lewes Nodular Chalk Formation, Seaford Chalk Formation And Newhaven Chalk Formation (undifferentiated) - Chalk. Sedimentary Bedrock formed approximately 72 to 94 million years ago in the Cretaceous Period. Local environment previously dominated by warm chalk seas.

Opis zastosowanego rozwiazania

A solution of TECCO G45/2 mesh was chosen along with TECMAT within the upper half of the slope to provide slope stability and erosion protection. The final solution included 340 rock bolts, the lower half of which were installed from track level during a possession with the help of Pro Rail Services long-reach RRV’s.

Inwestor

Wykonawca

Chroniony Objekt

Railway

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy