RXE-8000 rockfall barrier protecting mill facility in the background

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

Installation works in progress - visible special combined posts allowing helicopter transport

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

Slope morphology required reliable protection against 8000 kJ rockfalls and a height of 9 meters

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

Finally, a 50 meters long rockfall protection was installed

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

Overview of the Grasber Mine mill area

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

Drilling works required good preparation and special equipment suspended on ropes

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

Because of the size and helicopter transportation limits, posts were delivered in pieces, being screwed together directly on site

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

RXE-8000 middle post pieces being transported by the helicopter - visible project specific screw flanges

Kopalnie / Wydobycie / Tunel - Grasberg Mine 2015

9 meters high RXE-8000 rockfall barrier installed across a natural gully

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2015

Sytuacja początkowa

Rockfall hazard from the natural slopes above the mill area within the Grasberg mine had to be mitigated. After several incidents with boulders hitting buildings and infrastructure a fast and reliable solution had to be found.

Opis zastosowanego rozwiazania

The RXE-8000 rockfall barrier was installed across a very active gully on the east side of the mill area. Several rockfall incidents with boulders up to 2 meters in diameter had affected the mill infrastructure before. To ensure safe operation of the mill area below the gully, the barrier was installed approximately 140 meters above office buildings and ore processing facilities.

Inwestor

Freeport-McMoRan Inc.

Projektant

Geobrugg

Wykonawca

PT Freeport Indonesia

Inne przedsiębiorstwa

RPT-Indonesia

Chroniony Objekt

Mine / Quarry

Ochrona przeciwerozyjna

Galvanized, GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

Formularz kontaktowy

John Kalejta
 

John Kalejta

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,KS 67226 Wichita / USA

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Zagrożeniami naturalnymi
Geobrugg North America, LLC,OR 97302 Salem / USA

Formularz kontaktowy