Stabilizacja skarp - Fort Oranje, St. Eustatius 2020

The stabilized slope with mesh and spike plates - photo Acrobat X Caraibes

Stabilizacja skarp - Fort Oranje, St. Eustatius 2020

During installation of the mesh - photo Acrobat X Caraibes

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2020

Sytuacja początkowa

The historic Fort Oranje stands on a cliff which suffered from erosion. The goal was to maintain today's stable situation and to preserve it for the future. A package of civil engineering works was designed and installed.

Geologia

«The cliff consists of various layers of volcanic stones and ashes pressed together. This type of cliff is very sensitive to erosion. Cavities have been created, by groundwater seeping through the cliff as well as by rain and wind. Roaming goats play a major role in erosion on the island»

Opis zastosowanego rozwiazania

«Since February 2019, 2'800 anchors, 7400 square meters of canvas and just under 16.000 square meter of mesh have been placed. The project is meant to increase stability and stop the eroding of the cliff for the next five decades.

In the blazing sun, hanging on ropes, the workers of AcrobatsX have placed 42 kilometers of anchors in the cliff. During the last year the French acrobats abseiling from the cliff was a daily activity.

When my wife, Courtney, and I visited St.Eustatius in December 2019 for the first time, we saw the helicopter flying back and forth to F.D. Roosevelt Airport transporting the wire mesh. The French company is specialized in combatting falling stones.

Here the objective is to stop further erosion in order to prevent Fort Oranje from tumbling down in the Caribbean see. Seeds from native species will be planted before the rainy season starts Oleanders and Beach Morning Glory will be planted by Stenapa in September!»


We have cited Marnix van Rij, Governor St.Eustatius, who posted about about the finished stabilization works on LinkedIn, June 2020.

Geobrugg delivered 95 rolls of TECCO® 65/3 STAINLESS mesh.

Consulting: GEO BENELUX, Geobrugg Partner&Supplier Benelux countries, www.geobenelux.com

Inwestor

The Public Entity of St. Eustatius / Ministerie van Infrastructuur en Waterstaat

Wykonawca

Acrobat X Caraibes

Chroniony Objekt

Road, Residential area, Infrastructure

Ochrona przeciwerozyjna

INOX / STAINLESS

Projektant

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy