Clarea Bridge

Autostrada E70, 10059, Susa
2020
Inwestor
Wykonawca
Inne przedsiębiorstwa
Chroniony Objekt
Road, Railway
Wysokość ochronna systemu
4.0 m
Dlugosc systemu od
2540 m
Sytuacja początkowa

The Trans-European Network Transport is building a new railway line from Lyon to Turin to complete the Mediterranean Corridor. Near Turin, the railway line passes under the Clarea Bridge. Therefore, starting with the works, the railway line had to be protected from falling objects. Due to the project's international significance, the customer wanted to install a tested and approved system.

Opis zastosowanego rozwiazania

Our mobile debris fence system was modified to the Clarea bridge. Instead of using concrete barriers for panel fixation, external sleeves had to be developed, which could be mounted to the bridge. As the fixation method was changed to the original homologated mobile debris fence system, intensive testing took place following the FIA Standard 3502-2018 debris fence. The test procedure includes a car impact with a speed of 120 kph, which exceeds the speed driven in this bridge section.

As delivery via several tunnels was impossible, the panels assembly took place under the bridge. The panel racks were driven to the site along the bridge for installation. One half of the bridge site conditions required a large crane to lift the panel racks to the installation truck. This service, along with the sleeve and panel installation, was provided as a turnkey solution.

For enhanced safety, a secondary mesh layer was installed to prevent small objects from falling.

The complete project foresees about 2'540 meters of barriers on the two parallel freeway lanes (four sides).

Osoba kontaktowa na miejscu

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Zagrożeniami naturalnymi, Coastal Erosion Protection
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / USA
Saleh Feidi
Saleh Feidi
Regional Manager California
Zagrożeniami naturalnymi, Coastal Erosion Protection
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / USA
John Kalejta
John Kalejta
Regional Manager Central US
Zagrożeniami naturalnymi, Coastal Erosion Protection
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / USA
Bob Lyne
Bob Lyne
Regional Manager Southeast
Zagrożeniami naturalnymi, Coastal Erosion Protection
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / USA
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Zagrożeniami naturalnymi
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Zagrożeniami naturalnymi
Geobrugg North America, LLC
Salem OR 97302 / USA