스위스
스위스

myGeobrugg

Wisemansbridge Pembrokeshire

모니터링(Monitoring) - Wisemansbridge Pembrokeshire 2016

Rockfall directly after installation of 100 kJ barrier in 2016, type GBE-100A-R, without upslope retaining ropes

모니터링(Monitoring) - Wisemansbridge Pembrokeshire 2016

60 meters of installation looking west to east

모니터링(Monitoring) - Wisemansbridge Pembrokeshire 2016

Vertical seem in fence mesh panels joined with shackles; safe deformation even though the event is huge

모니터링(Monitoring) - Wisemansbridge Pembrokeshire 2016

Impact on December 11, 2020: rocks and debris were stopped by the barrier

모니터링(Monitoring) - Wisemansbridge Pembrokeshire 2016

Impact zone and dashboard of the monitoring device Geobrugg Guard at the time of the impact

 
 

설치 년도

2016

Situation

After winter storms a small landslide had accured east of our existing 2014 installation.

Description

It was decided to build an additional 60 m of GBE-100A-R barrier to protect the coast path and the public.

The day after the installation period an additional rock fall occurred. The foot path was able to remain open as the materials stayed behind the barrier. The fence was then lowered, cleared and repaired. A small section of 6 metres of TECCO G80/4 material was ordered to make the fence look as new. No mesh destruction was detected.

Impact, December 2020
Not only the rockfall barrier worked perfectly. Also, the Geobrugg GUARD, installed in February 2020, did its job by detecting the impact and monitoring the high corrosion rate in this coastal environment (see pictures).

Country/Region

영국

Customer

Pembrokeshire County Council

Engineering

Geobrugg

Contractor

ABCAS

Protected object

Touristic infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

자연 재해
수리학
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 , Msc. Env. Eng.

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일