스위스
스위스

myGeobrugg

Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Tidong power plant with protection installations from the distance

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Drilling operation at site

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Challenging site condition - works exactly above the powerhouse

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® protective mesh

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® and QUAROX® protective mesh

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of the ringnet rockfall barrier, which, together with the mesh, protects the infrastructure.

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of RXE-500 rockfall barrier

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

30 meters of 500 kJ rockfall barrier installed to protect SST-UAT area

낙석방호시스템 - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

RXE rockfall protection barriers offer maximum safety in the tightest of spaces

 
 

시스템 길이

30 m

 

설치 년도

2024

Situation

The project location in Himachal Pradesh, India, lies approximately 40 kilometers east of Kalpa. In 2019, the powerhouse below the cliff was still under construction. By 2024, however, it was fully operational, with sophisticated equipment installed within and on top. Ensuring the prevention of rockfalls during slope stabilization work was critical, as the area was narrower compared to previous work. Dead trees on the vertical edges of the cliff added to the project’s complexity, requiring careful negotiation. Design and technological modifications were necessary at every step. Rockfalls have been observed in the SST-UAT area of the powerhouse, prompting the customer to request a barrier solution for this specific location.

Description

The site required a cost-effective protection system to stabilize the problematic slope and safeguard the powerhouse area permanently. The chosen solution needed to address several challenges: an almost vertically unstable slope with limited accessibility, complex geological conditions, and strict installation time constraints. The client entrusted us with the full responsibility for designing, supplying, and installing the solution.

The client relied on the previously installed flexible slope stabilization system, which utilized QUAROX® 0.3/6.5/275 rolled cable net with Geobrugg SUPERCOATING and high tensile rockfall protection netting DELTAX® G80/2 (secondary mesh)—total area 3500 square meters.  The installation included a variable grid pattern and fully grouted rock bolts with a diameter of 32 mm and a length of 3 meters.

Additionally, an RXE-500 rockfall barrier line of 30 meters, with a post height of 4 metes capable of absorbing impact energies up to 500 kJ, was installed in the SST-UAT area to protect both men and machinery. 

Country/Region

인도

Customer

Statkraft

Protected object

Infrastructure

부식방지

Galvanized

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

자연 재해
수리학
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 , Msc. Env. Eng.

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일