A picture of the final inspection of the debris flow barrier at -20°C in February 2026

 - Raumabanen - Verma 2026

Project site Raumabanen - Verma after the event and before the measures

 
 

시스템 길이

51 m

 

설치 년도

2026

Situation

Following a landslide at Verma station on 19 July 2025, the Rauma railway line (Raumabanen) between Dombås and Åndalsnes was destroyed. The landslide struck the tracks at two locations, suspending train services between Dombås and Åndalsnes. 

The landslide was triggered by torrential rain above the tree line beneath Mount Bjørnhammeren. The landslide debris struck both the upper and lower sections of the railway line at Verma station, as well as the E136. The Romsdal Railway runs through challenging terrain in the Romsdalen valley. At Verma station, a spiral-shaped tunnel is used to negotiate the difference in altitude. This means that the train passes through the same area twice – once on its way into the tunnel and once on its way out. As a result, the line was affected by the same landslide in two places. Securing and reconstructing the area is a highly complex project involving disciplines such as geology, geotechnical engineering, hydrology and railway infrastructure.

Description

To protect the two railway lines and the road beneath them, the first step was to install a reinforced rockfall barrier (Geobrugg RXE-5000) directly above the railway lines. The second step was to install a UX180-H6 barrier above this, adapted to the on-site conditions. The repair works were taking place in a very challenging, steep area prone to landslides. 

The customized barrier is designed to withstand multiple natural hazards. Following the natural hazard assessment, it was determined that rockfalls, debris flows and slush flows were to be expected at the site. The barrier was designed to withstand all these impacts. To prevent debris and slush from flowing around the barrier, it was constructed with several changes in direction towards the mountain. The aim was to keep the top edge of the barrier at a consistent height, to create a basin, and, in the event of overflow, to channel it towards the center

Country/Region

노르웨이

Customer

Engineering

Protected object

Railway, Touristic infrastructure, Infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

Saleh Feidi
 

Saleh Feidi

Regional Sales Manager California and Nevada

자연 재해
충격 보호
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국 Regional Sales Manager California and Nevada

이메일

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

자연 재해
충격 보호
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 미국 Regional Sales Manager Northeast

이메일

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

자연 재해
충격 보호
Geobrugg North America, LLC,KS 67226 Wichita / 미국 Regional Manager Rocky Mountains / Central USA

이메일

Robert Long
 

Robert Long

Regional Sales Manager Southeast

자연 재해
충격 보호
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 미국 Regional Sales Manager Southeast

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

이메일

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

자연 재해
충격 보호
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / 미국 Regional Sales Manager Pacific Northwest and Hawaii

이메일