스위스
스위스

myGeobrugg

Ligne 664000 de Pau à Canfranc - Déblai du tunnel de l'Araou

비탈면 보강 시스템 - Ligne 664000 de Pau à Canfranc - Déblai du tunnel de l'Araou 2023

Made-to-measure stabilization with our range of flexible facings stands unobtrusively among other solutions

비탈면 보강 시스템 - Ligne 664000 de Pau à Canfranc - Déblai du tunnel de l'Araou 2023

The route was threatened by multiple boulder falls

비탈면 보강 시스템 - Ligne 664000 de Pau à Canfranc - Déblai du tunnel de l'Araou 2023

Environmental constraints (wildlife/birds): Openings in the SPIDER S3-130 mesh are made using a wire rope and clips

비탈면 보강 시스템 - Ligne 664000 de Pau à Canfranc - Déblai du tunnel de l'Araou 2023

Environmental constraints (wildlife/birds): Openings in the TECCO G65/3 mesh are made with wire ropes clips

비탈면 보강 시스템 - Ligne 664000 de Pau à Canfranc - Déblai du tunnel de l'Araou 2023

TECCO system can stabilize highly irregular slopes

 

설치 년도

2023

Situation

The railroad line 664000 from Pau to Canfranc runs alongside the Gave d’Aspe when it reaches the commune of Bedous, where it has a mixed cut-and-fill profile. The upper part of the cut-and-cover slope is composed of a limestone cliff, generating numerous boulder falls of up to several hundred liters, threatening the operation of the track.

Description

Different risk zones were identified according to the volumes of instability observed. Geobrugg assisted the project manager in sizing the most suitable solutions for each zone using the RUVOLUM software. SPIDER S3-130 netting was installed in the areas with the greatest weathered thickness and TECCO G65/3 in the other areas.

Customer

SNCF Réseaux

Engineering

SNCF Réseaux

Contractor

Gauthier

Subcontractor

NGE Fondations

Protected object

Railway

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

이메일

Olivia Sartorius
   

Olivia Sartorius

자연 재해
수리학
광산 / 터널
Geobrugg AG

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스

이메일