스위스
스위스

myGeobrugg

낙석방호시스템 - Hurunui 2024

Looking East - attenuator with fixed posts

낙석방호시스템 - Hurunui 2024

Looking East - attenuator with fixed posts

낙석방호시스템 - Hurunui 2024

Looking West - attenuator support rope separation

낙석방호시스템 - Hurunui 2024

Looking West - attenuator support rope separation

낙석방호시스템 - Hurunui 2024

Looking West - attenuator with Hurunui river and State Highway 7 (SH7) in the background

낙석방호시스템 - Hurunui 2024

Attenuator rockfall protection blends into the scenery

낙석방호시스템 - Hurunui 2024

Fantail Bird liking its new playground - Geobrugg Systems work with nature

 

시스템 길이

100 m

 

설치 년도

2024

Situation

Frequent rockfall onto the Hurunui Bluff Road caused a hazard to the road users.

Description

A fixed post rockfall protection attenuator was installed to redirect and guide rocks down to the toe of the slope. The posts were spaced 15 - 20 metres and placed on the high spots. The drape length was 7 - 9 metres. A support rope separation was installed halfway along, and a bottom rope was installed to control tail kick out. The system was installed efficiently using an excavator drill and Knuckle boom.

Country/Region

뉴질랜드

Customer

Private

Contractor

Protected object

Road

부식방지

GEOBRUGG ULTRACOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG Project Manager Sales Eastern Switzerland

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일