토석류 및 산사태 방호 시스템 - Borusan EnBW 2019

18 meters top width require strong GEOBINEX ropes

토석류 및 산사태 방호 시스템 - Borusan EnBW 2019

8 meters long wire rope anchors placed in 92 mm bore holes - anchoring in solid rock is required to resist the enormous forces of debris and mudflows

토석류 및 산사태 방호 시스템 - Borusan EnBW 2019

Final control of the VX160-H6 ringnet barrier

 

Systems

 

시스템 길이

15 m

 

설치 년도

2019

Situation

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Description

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

Country/Region

터키

Customer

Borusan EnBW

Engineering

Geobrugg AG

Contractor

Artusa Geohazard

Protected object

Other

부식방지

GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi
 

Saleh Feidi

자연 재해
수리학
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국

이메일

John Kalejta
 

John Kalejta

자연 재해
수리학
Geobrugg North America, LLC,KS 67226 Wichita / 미국

이메일

Bob Lyne
 

Bob Lyne

자연 재해
수리학
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

이메일

Tim Shevlin
 

Tim Shevlin

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국

이메일