 - Olt Valley, km 239+500 - 246+500 - Rock 2015

GBE-1000A rockfall barrier protecting national road DN7

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

GBE-1000A rockfall barrier base plate anchors drilling works

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Drilling flexible wire rope anchors for the GBE-1000A barrier

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

One of the GBE-1000A rockfall barrier lines, completely installed

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

GBE-1000A rockfall without border post - special solution for direct rock face connection

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Perfect solution containing passive GBE-1000A rockfall barrier and active slope stabilization with nailed TECCO® SYSTEM³

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Another line of GBE-1000A barrier with direct rock face connection

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Fully installed VX-060L debris flow barrier

 - Olt Valley, km 239+500 - 246+500 - Rock 2015

A short - only 22 m long - GBE-1000A barrier along national road DN7

 

システム

 

システム延長

20 m - 50 m

 

設置年

2015

状況

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

説明

GBE rockfall barriers were provided as a passive protection at the following sectors:

1. km 240+454 - 240+510

GBE-1000

  • capacity: 1000 kJ
  • height: 5 m
  • length: 56 m

2. km 240+555 - 240+577

GBE-1000

  • capacity: 1000 kJ
  • height: 3 m
  • length: 22 m

3. km 242+453 - 242+457 (as a debrisflow barrier)

VX-060

  • height: 3 m
  • length: 8 m

 4. km 242+457 - 242+610

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m and 36 m

 5. km 242+859 - 242+940

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

 

6. km 243+099 - 243+179

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

See also the other projects of Olt Valley.

国名

ルーマニア

顧客名

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

エンジニアリング

A.C. IRIMAT Cons S.R.L.

落札者

S.C. VECTRA GROUP S.A.

下請

Sachschische Bau GmbH Dresden Germany, Sibiu Branch

保護対象

道路

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム