スイス
スイス

myGeobrugg

 - Maconde Cliff 2023

Installation of the drape system.

 - Maconde Cliff 2023

Installation of the mesh with the help of a rope access worker.

 - Maconde Cliff 2023

Lateral view of the TECCO mesh.

 - Maconde Cliff 2023

Transport of the mesh roll with the crane.

 - Maconde Cliff 2023

Rolling down the TECCO mesh.

 - Maconde Cliff 2023

The TECCO mesh blends in well with the surrounding.

 
 

設置年

2023

状況

On the South coast of Mauritius, at Maconde Cliff, a famous tourist attraction, many unstable rocks needed to be secured. The biggest problems were some major horizontal joints, weathered rocks and the presence of discontinuities along large rocks. The cliff is 30 metres high and 175 metres long with an inclination of 85 degrees.

説明

After a site visit, we prepared a preliminary design proposal with the use of the RUVOLUM Tool. 

To prevent slope failures and falling rocks several sections required an active and passive slope stabilization system. The active being the TECCO System and the passive one being the drape system.

Both systems used to stabilize the cliff were made from TECCO G65/3 STAINLESS steel mesh.

 

A big thank you to Yannick Labonne from Acrocha CO LTD for the stunning pictures. 

国名

モーリシャス

エンジニアリング

落札者

保護対象

道路, 観光用インフラ

腐食防止

ステンレス

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Country Manager Eastern and Central Switzerland

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Country Manager Southern Switzerland

お問い合わせフォーム